Sorry Im a bit slow with the response.
It is showing the job succeeded now, but the merge definitely happened before the mandatory job was merged. the Job was Bazel Build & Test. (See screenshot 3 and 4)
In Graphite, it says that PR was finished at
141843. (AEST). (See Screenshot 1)
However, if you click on the Bazel Build & Test Link in the screenshot you posted above, it shows that the mandatory step finished running at
042712 (GMT), which is 14:27 AEST - 10 minutes later. (See Screenshot 2)
What is strange, is Graphite is showing the status reports for:
https://github.com/wayvz-io/network_intent_manager/runs/49464529240
Which is triggered by commit #
7188364, but the bypass was against "pushed
0aa0524..52358d2 to
main in repo
network_intent_manager"