Hi all! Worked with PVS since it was release but never faced a subnet change of the PVS servers. In this setup someone decided to split the targets and PVS servers (HA) into different subnets. They are facing some retries and I want to move the servers to the same net where the targets reside.
My plan is to move the load to PVS server 1 and then change configuration on number 2, including bootstrap. Then move the load back to the newly configured server 2 and then do the same config on 1. BUT is this possible during production, will the targets get the new IP configuration of the PVS servers on the fly or is it necessary with a reboot to get the correct information from in this case the ardbp32.bin file?