We're dealing with a situation where a large range of OS releases (Ubuntu LTS in this case) are connected to the same Puppet setup, but the gap between the oldest (20.04 ESM) to newest (24,04, soon to be 26.04) means that a single set of modules isn't feasible. Are there best practices or suggestions about how best to use environments to split them out, when to create new environments, and how to move machines between environments if they're release-upgraded?