10/15/2020, 11:49 PM
Work weekend #4 projects • install weather station • winterization (@cool-pizza-44770 will elaborate what this means) • anything else?
c

cool-pizza-44770

10/15/2020, 11:50 PM
winterization: • spray clear coat on allll the signs! Easy job but you gotta walk/drive cross the whole park • tarp the lumber piles! may require hunting down tarps or buying some? • drag the dock-things up to the high water line; tie them to trees with rope so they don't float away • secure The Lake sign so it doesn't fall over in heavy winds with all the soil turned to mude • build secure base for Hi! sign at the gate.
Looks like our work crew is: • Matt the Katt crew (4) • Lydia n Elli • Chuk, Renee, Ana • Gene • Martin n Patrick So we can have ppl sign up for these little jobs like this 1. Gene leads weather station 2. Clear Coat? Lydia/Elli? (ask them not to tag shit tho, the vandals) 3. Tarps? (requires rounding up tarps, thus talking to Mack) 4. Lake sign and Hi sign: chuk can do this 5. Ladders on docks: chuk wants to play 6. Tie up docks: easy job during Sunday dip.
c

clean-army-21719

10/16/2020, 6:47 PM
@square-country-13088 any idea on the tarp situation / if Mack definitely does or definitely does not want us to work on projects 2 and 3? I think the other projects are easy and obvious helpful activities that she will not have made plans for, but there is the possibility that she already has plans to make 2 & 3 happen
s

square-country-13088

10/16/2020, 6:48 PM
I haven’t asked at all. I figure we’re getting her this $$$ weather station which means we can relax and fuck around instead of breaking our backs doing hard labor
c

cool-pizza-44770

10/16/2020, 6:57 PM
yeah don't do anything you don't want to do; i want the signs to still have paint on them next summer and the wood not to get drenched in the rain. i understand that's not something she has the spoons to fix. i did this job for the place last yr and it'd be great if they already did 2,3,4,5, and 6!