Hi team, can someone help me with a bridge letter ...
# permit-saas
j
Hi team, can someone help me with a bridge letter for SOC 2 Type II? It will help us with our upcoming audit
a
Hi @Joop, I'm an AI assistant for Permit.io. I'll analyze available sources and get back to you shortly.
Permit.io completed its latest SOC 2 Type II renewal in January 2026, and the report is available to qualified customers and prospects (1) . For a bridge letter specifically, that's not something covered in the sources I have access to. Your best option is to request this directly through the Trust Center's document request process, or reach out to help@permit.io with your request — specifying that you need a bridge letter for your audit timeline .
To learn more, see the sources I considered: [[1] Trust Center | Permit.io](https://www.permit.io/trust)
Appreciate the feedback! Feel free to ask me again with additional guidance or context.
o
Do you mean a bridge letter for our SoC2 ? We are still in the coverage period. We've started renewal (like every year) but a bridge letter is not needed yet. Or do you mean something else?
j
Ah, the latest report I received mentions: "For the period December 1, 2024 to November 30, 2025" How can I request the latest?
o
@david can help you with that
d
Hi @Joop I see that I sent you last years soc2, apologies. I will send over the latest to your email
j
Thank you Or and David! Much appreciated
d
Hi @Joop the soc2 is filed for the previous year so that actually is the most up to date report and there is no need for bridge letter. The next report will be filed in December 2026
j
Apologies, I misunderstood how those reports work. Thanks for letting me know the new one is planned. I think that will be enoug