Shrinivas Khawase
06/14/2024, 9:18 AMSomething to note is that if the content of your contract has not changed since the previous verification, then the contract will be “pre-verified” with the results of the last verification. This means that most of the time, you should be able to go straight from the consumer test/package phase into the deploy phase.Is there a way to know using an event if pact contract has changed ( which does not care about the consumer version but only if the contract has changed) I have tried to use
contract_content_changed but looks like tags and consumer versions are considered while returning this event.Yousaf Nabi (pactflow.io)