Hi all, I would like to use this thread for discu...
# pinot-dev
s
Hi all, I would like to use this thread for discussing about 0.8.0 release. Some points that we need to discuss: • Should we cut the release before or after the graduation? • Let’s call the timeline so that people can check-in the features to be included to the release I think that we should make the call first on the before/after graduation and then decide the timeline.
m
Thanks @User, my thoughts:
Copy code
1. If the graduation process requires a release, let's cut it before.
2. If it does not, then lets fix things like licensing at least.
3. Let's collect data if we have enough features since 0.7.1 that calls for a new release.